TECHNICAL AND ECONOMICAL EVALUATION OF A PROPOSAL TO DOUBLE THE USABLE VOLUME OF KASTRAKI HYDROELECTRIC PROJECT RESERVOIR ON ACHELOOS RIVER, BY INSTALLING ON THE SPILLWAY CREST FREE STANDING SAFETY GATES (FUSEGATES).

Ref.No: 62194500
Start date: 01.06.2005
End date: 31.01.2006
Approval date: 22.06.2005
Department: CIVIL ENGINEERING
Sector: WATER RESOURCES AND ENVIRONMENTAL ENGINEERING
Financier: ETAIREIA RAYCAP A.E.
Budget: 17.850,00 €
Scientific Responsible: IOANNIS STEFANAKOS
Email: jstef@tee.gr
Description: THE PRESENT PROJECT DEALS WITH A STUDY TO CHECK AND EVALUATE THE PROPOSAL TO DOUBLE THE USABLE VOLUME OF KASTRAKI HYDROELECTRIC PROJECT RESERVOIR ON ACHELOOS RIVER, BY INSTALLING ON THE SPILLWAY CREST FREE STANDING SAFETY GATES (FUSEGATES).