| Ref.No: | 62190800 |
| Start date: | 09.09.2005 |
| End date: | 31.12.2007 |
| Approval date: | 01.04.2005 |
| Department: | CIVIL ENGINEERING |
| Sector: | WATER RESOURCES AND ENVIRONMENTAL ENGINEERING |
| Financier: | LIMENIKO TAMEIO HANION |
| Budget: | 59.500,00 € |
| Scientific Responsible: | KONSTANTINOS MOUTZOURIS |
| Email: | lhwmout@central.ntua.gr |
| Description: | A PHYSICAL MODEL OF THE HARBOUR AND THE ADJACENT COAST WILL BE BUILT IN A WAVE BASIN OF THE LABORATORY OF HARBOUR WORKS, NTUA. THE RESPONSE OF THE COAST TO THE CONSTRUCTION OF THE PROPOSED COASTAL PROTECTIVE STRUCTURES WILL BE EXAMINED. |
