| Ref.No: | 62113401 |
| Start date: | 07.09.2000 |
| End date: | 31.12.2010 |
| Approval date: | 19.09.2000 |
| Department: | CIVIL ENGINEERING |
| Sector: | WATER RESOURCES AND ENVIRONMENTAL ENGINEERING |
| Financier: | O.L.P. |
| Budget: | 69.258,99 € |
| Scientific Responsible: | KONSTANTINOS MOUTZOURIS |
| Email: | lhwmout@central.ntua.gr |
| Description: | THE NEW CONTAINER TERMINAL III OF THE PORT OF PIRAEUS WILL BE STUDIED ON A PHYSICAL MODEL IN THE LABORATORY OF HARBOUR WORKS. WAVE PENETRATION AND SHIP MOTION WILL BE STUDIED. |
