MINING OPERATIONS SITING ASSESMENF AND ANALYSIS OF THEIR OPTIMAL DISTANCE FROM ADJACENT CRITICAL LOCATIONS

Ref.No: 62432900
Start date: 01.04.2025
End date: 31.01.2026
Approval date: 26.02.2025
Department: MINING AND METALLURGICAL ENGINEERING
Sector: MINING ENGINEERING
Financier: IMERYS VIOMIHANIKA ORUKTA A.E.
Budget: 70.680,00 €
Public key: ΨΑΣΚ46ΨΖΣ4-8ΩΔ
Scientific Responsible: Prof. BENARDOS
Email: abenardos@metal.ntua.gr
Description: THE SCOPE OF THE PROJECT IS TO ASSESS THE POTENTIAL IMPACTS ON SPECIFIC SITES OF INTEREST (BUILDINGS OR SETTLEMENTS, HOUSES, ETC.) FROM THE EXPLOITATION WORKS CARRIED OUT IN AN AREA THAT INCLUDES THE AGGERIA, AGIO IRINI, KOUFI OPEN-PIT MINES, IN RELATION TO THEIR OPTIMAL MINIMUM DISTANCE FROM THE ABOVE CRITICAL LOCATIONS.
THE AIM IS, BASED ON THE RESULTS OBTAINED, TO REGULATE THE SITING OF MINING OPERATIONS NEAR THE ABOVE CRITICAL POINTS OF INTEREST, ENSURING THE SAFETY OF THE LATTER. MORE SPECIFICALLY, RISKS AND ADVERSE IMPACTS (GEOTECHNICAL STABILITY OF SURFACE STRUCTURES, DISTURBANCES FROM VIBRATIONS OR NOISE POLLUTION, VISUAL AND AIR POLLUTION) THAT MAY ARISE FROM THE MINING OPERATIONS ARE ASSESSED, HAVING AS A GUIDLINE THE ASSESSMENT OF THE MINIMUM OPTIMAL DISTANCE THAT SHOULD EXIST BETWEEN THE EXPLOITATION AND THE AFOREMENTIONED POINTS OF INTEREST.