EVALUATION AND ASSESSMENT OF PROJECT RISK

Ref.No: 62436000
Start date: 16.07.2025
End date: 15.03.2026
Approval date: 16.07.2025
Department: MINING AND METALLURGICAL ENGINEERING
Sector: MINING ENGINEERING
Financier: ENALOS R&D- ENALOS EREUNA KAI ANAPTUXI IKE
Budget: 68.200,00 €
Public key: ΨΔ9Ψ46ΨΖΣ4-1ΔΙ
Scientific Responsible: Prof. BENARDOS
Email: abenardos@metal.ntua.gr
Description: THE SCOPE OF THE PROJECT IS THE EVALUATION ΑΝΔ RISK ASSESSMENT DURING THE CONSTRUCTION AND OPERATION OF THE RAILWAY FREIGHT SORTING STATION AT THE PORT OF KAVALA WITH THE MAIN OBJECTIVE OF ASSESSING AND EVALUATING THE RISK AS WELL AS EVALUATING AND DESIGNING THE MEASURES TO ADDRESS RISKS ARISING FROM THE CONSTRUCTION AND OPERATION OF THE RAILWAY FREIGHT SORTING STATION. AT THE SAME TIME, THE ASSESSMENT OF SAFE DISTANCES WILL BE CARRIED OUT - AND BASED ON THE POSSIBLE PROPOSED RISK CONTROL MEASURES - FROM THE CRITICAL LOCATIONS CONCERNING THE AMMONIA PRODUCTION UNIT AND THE STORAGE TANK OF THE COMPANY KAVALA FERTILIZERS LTD AS WELL AS TO THE AREA / LOCATION WHERE THE SECOND NATURAL GAS PIPELINE SUPPLYING THE SAID FACILITY IS LOCATED
Go to Top