| Ref.No: | 65243600 |
| Start date: | 26.11.2025 |
| End date: | 31.12.2026 |
| Approval date: | 26.11.2025 |
| Department: | DIOIKISI |
| Financier: | EIDIKOS LOG/MOS EMP |
| Budget: | 260.000,00 € |
| Public key: | ΡΩ3Ι46ΨΖΣ4-7ΘΦ |
| Scientific Responsible: | Prof. NIKOLAOS LAGAROS |
| Email: | nlagaros@central.ntua.gr |
| Description: | ON 7/11/2025 THE SLOW START ACCEPTANCE OF THE NTUA CENTRAL COMPUTING INFRASTRUCTURE INSTALLED IN THE BASEMENT OF THE ADMINISTRATION BUILDING TOOK PLACE. FOR THE FULL OPERATION OF THE SYSTEM, THE FOLLOWING PROCUREMENTS ARE REQUIRED: 4 AIR-COOLED IN-ROW COOLING UNITS, 2 AIR-COOLED IN-ROW COOLING UNITS WITH AN INTEGRATED CONDENSATE SYSTEM, AN EXPANSION OF THE UPS CAPACITY TO 200 KW WITH THE ADDITION OF 2 POWER MODULES, A COMPLETE MONITORING/SURVEILLANCE SYSTEM FOR SECURITY REGARDING ACCESS, TEMPERATURE-HUMIDITY CONDITIONS AND REMOTE SUPERVISION, AND AN AUTOMATIC FIRE-EXTINGUISHING SYSTEM WITH SPRINKLERS, WITH A TOTAL COST OF €260,000.00 (INCLUDING VAT). THE FUNDING OF THE PROJECT WILL BE AS FOLLOWS: €150,000.00 WILL BE TRANSFERRED FROM THE PROJECT “REPAIR/MAINTENANCE OF THE ELECTRICAL NETWORK OF THE ADMINISTRATION BUILDING,” WHICH HAD BEEN APPROVED BY THE ADMINISTRATION COUNCIL DECISION DATED 05.06.2025 BUT WAS NOT ACTIVATED, AND €110,000.00 WILL COME FROM THE RESERVES OF THE ELKE (SPECIAL ACCOUNT FOR RESEARCH FUNDS). |