MINIMISATION OF THE ENVIRONMENTAL IMPACTS OF A QUARRY AND A MARBLE PROCESSING UNIT THROUGH THE UTILISATION OF BY-PRODUCTS AND WASTES IN ECONOMIC ADDED VALUE USES

Ref.No: 61118800
Start date: 26.10.1999
End date: 31.01.2002
Approval date: 10.02.2000
Department: MINING AND METALLURGICAL ENGINEERING
Sector: MINING ENGINEERING
Financier: Π.Α.Β.Ε., MEGKA MARM EPE
Budget: 35.216,43 €
Scientific Responsible: KONSTANTINOS PANAGOPOULOS
Email: mmescp@central.ntua.gr
Description: THE AIM OF THIS PROJECT IS TO INVESTIGATE THE UTILISATION POTENTIALS OF THE BY-PRODUCTS AND WASTES GENERATED DURING THE EXPLOITATION AND THE MARBLE PROCESSING.
Go to Top