| Ref.No: | 62242300 |
| Start date: | 01.11.2008 |
| End date: | 30.04.2011 |
| Approval date: | 04.07.2008 |
| Department: | CIVIL ENGINEERING |
| Sector: | WATER RESOURCES AND ENVIRONMENTAL ENGINEERING |
| Financier: | RAE - RUTHMISTIKI ARHI ENERGEIAS |
| Budget: | 72.600,00 € |
| Scientific Responsible: | IOANNIS STEFANAKOS |
| Email: | jstef@tee.gr |
| Description: | THE PRESENT PROJECT DEALS WITH A STUDY TO CHECK AND EVALUATE THE POSSIBILITY TO ADD PUMP-STORAGE SCHEMES TO THE EXISTING PPC HYDROELECTRIC PROJECTS IN CASCADE,SO TO EXISTING UPPER AND LOWER RESRVOIRS AND HYDROELECTRIC POWER PLANTS. IT WILL DEAL ALSO.... |
