| Ref.No: | 62261700 |
| Start date: | 08.10.2009 |
| End date: | 09.10.2013 |
| Approval date: | 20.07.2009 |
| Department: | CIVIL ENGINEERING |
| Sector: | WATER RESOURCES AND ENVIRONMENTAL ENGINEERING |
| Financier: | DIMOS ASINIS N. ARGOLIDAS |
| Budget: | 44.280,00 € |
| Scientific Responsible: | KONSTANTINOS MEMOS |
| Email: | cmemos@mail.ntua.gr |
| Description: | THE PROJECT INCLUDES IDENTIFICATION OF THE WAVE AND CURRENT REGIMES,THROUGH WIDELY ACCEPTED NUMERICAL MODELS; PRELIMINARY LAYOUT OF PROPOSED WORKS AIMING AT PROTECTING THE SOUTHERN BASIN OF TOLO HARBOUR PROVIDING THE MAXIMUM POSSIBLE QUAY LENGTH OPTIMIZ |