| Ref.No: | 91022800 |
| Start date: | 09.10.2025 |
| End date: | 08.04.2026 |
| Approval date: | 10.09.2025 |
| Department: | MINING AND METALLURGICAL ENGINEERING |
| Sector: | MINING ENGINEERING |
| Financier: | PERIFEREIAKH ENWSH DHMWN P E D KRHTHS |
| Budget: | 37.200,00 € |
| Public key: | 9ΓΙΙ46ΨΖΣ4-ΑΧΝ |
| Scientific Responsible: | Prof. KALIAMPAKOS |
| Email: | dkal@central.ntua.gr |
| Description: | THE OBJECT OF THE RESEARCH PROJECT IS THE TECHNICAL AND SCIENTIFICALLY DOCUMENTED EVALUATION OF THE PLANNED OVERHEAD ROUTING OF THE HIGH VOLTAGE POWER TRANSMISSION LINE (CHANIA HVC - DAMASTA HVC), OF THE INDEPENDENT POWER TRANSMISSION OPERATOR S.A. (IPTO) COMPANY, IN NORTHERN CRETE AND THE INVESTIGATION OF ALTERNATIVE SCENARIOS FOR ITS ROUTING. THE RESEARCH AIMS AT INVESTIGATING THE ECONOMIC, SOCIAL AND ENVIRONMENTAL ASPECTS OF THE PLANNED ROUTING AND THE ALTERNATIVE ROUTING SCENARIOS ALREADY PROPOSED BY TECHNICAL BODIES, I.E. THE UNDERGROUND PLACEMENT OF THE LINE AND THE LAYING OF A SUBMARINE CABLE, OR TO BE PROPOSED BY THE RESEARCH TEAM. |