| Ref.No: | 65184100 |
| Start date: | 01.12.2010 |
| End date: | 30.11.2012 |
| Approval date: | 14.01.2011 |
| Department: | MINING AND METALLURGICAL ENGINEERING |
| Sector: | MINING ENGINEERING |
| Financier: | ΒΑΣΙΚΗ ΕΡΕΥΝΑ, EIDIKOS LOG/MOS EMP |
| Budget: | 15.000,00 € |
| Scientific Responsible: | Lecturer APOSTOLOPOULOS |
| Email: | gapo@metal.ntua.gr |
| Description: | THE PROJECT OBJECTIVE IS TO INVESTIGATE THE POSSIBILITY OF COMBINED INTERPRETATION OF GEOPHYSICAL DATA BETWEEN DRILLINGS WITH MULTIPARAMETRIC STATISTICAL ANALYSIS METHODS IN REAL CONDITIONS.THE END RESULT IS A NEW METHOD OF COMBINED INTERPRETATION OF |
