| Ref.No: | 63270700 |
| Start date: | 08.10.2025 |
| End date: | 30.09.2029 |
| Approval date: | 08.10.2025 |
| Department: | CIVIL ENGINEERING |
| Sector: | STRUCTURAL ENGINEERING |
| Financier: | HORIZON EUROPE, E.C. |
| Budget: | 164.875,00 € |
| Public key: | 6ΥΦΙ46ΨΖΣ4-Ο9Χ |
| Scientific Responsible: | Prof. NIKOLAOS LAGAROS , NTENIS ISTRATI |
| Email: | nlagaros@central.ntua.gr,denis.istrati@gmail.com |
| Description: | ATLANTIC AIMS TO DRIVE A BREAKTHROUGH IN THE SECTOR BY PROVIDING A HOLISTIC DESIGN SOLUTION, ADDRESSING BOTH TECHNOLOGY AND EUROPEAN SUPPLY CHAINS. THE PROJECT WILL DEMONSTRATE A DISRUPTIVE 5 MW FLOATING UNIT WITH A PYRAMIDAL DESIGN, CONNECTED TO THE GRID AT LE CROISIC, FRANCE. IT WILL CREATE A PATHWAY TO REACH A LEVELISED COST OF ENERGY (LCOE) OF 85€/MWH BY 2030 (AND 57€/MWH BEYOND 2035) WITH A CARBON FOOTPRINT <16 GCO2EQ/KWH. OVER TWO YEARS, EXTENSIVE DATA MONITORING FROM THE PILOT WILL ALLOW FOR FUTURE OPTIMISATION OF INDUSTRY-SCALE COMMISSIONING, ADDRESSING PERFORMANCE, ENVIRONMENTAL CONSIDERATIONS, AND FUTURE HARBOUR LOGISTICS. IT WILL ALSO LAY THE GROUND FOR ESTABLISHING A EUROPEAN SUPPLY CHAIN TO ENABLE THE LARGE-SCALE PRODUCTION OF FLOATING OFFSHORE WIND FARMS AND ENHANCE EU SOVEREIGNTY. |
