PROTECTION AND DEVELOPMENT OF THE COASTAL ZONE OF ORMIDIA CYPRUS

Ref.No: 62277800
Start date: 27.10.2010
End date: 31.12.2013
Approval date: 11.10.2010
Department: CIVIL ENGINEERING
Sector: WATER RESOURCES AND ENVIRONMENTAL ENGINEERING
Financier: UPOURGEIO SUGKOINONION KAI ERGON KUPROU
Budget: 221.400,00 €
Scientific Responsible: KONSTANTINOS MOUTZOURIS
Email: lhwmout@central.ntua.gr
Description: ALL FIELD DATA WILL BE COLLECTED.A PHYSICAL MODEL OF THE COAST WILL BE BUILT IN A WAVE BASIN OF THE LABORATORY OF HARBOUR WORKS,NTUA.THE COASTAL STRUCTURES NECESSARY FOR THE PROTECTION OF THE COAST WILL BE STUDIED.
Go to Top