PRIMARY ENERGY SUBSTITUTION BY INTEGRATION OF A WASTE INCINERATION INTO AN EXISTING COAL FIRED POWER STATION AS HYBRID PLANT CONFIGURATION

Ref.No: 63115901
Start date: 01.01.2000
End date: 31.03.2004
Approval date: 10.03.2006
Department: MECHANICAL ENGINEERING
Sector: THERMAL ENGINEERING
Financier: ENERGY ENVIRONMENT AND SUSTAINABLE DEVOLPMENT, E.C.
Budget: 2.047,39 €
Scientific Responsible: Prof. KAKARAS
Email: ekak@central.ntua.gr