Ref.No: | 63246200 |
Start date: | 01.10.2022 |
End date: | 30.09.2026 |
Approval date: | 15.06.2022 |
Department: | MINING AND METALLURGICAL ENGINEERING |
Sector: | METALLURGY AND MATERIALS TECHNOLOGY |
Financier: | HORIZON, E.C. |
Budget: | 480.312,50 € |
Public key: | 9ΕΔΩ46ΨΖΣ4-Λ0Υ |
Scientific Responsible: | Assoc. Prof. TAXIARCHOU |
Email: | taxiarh@metal.ntua.gr |
Description: | LICORNE AIMS TO ESTABLISH THE FIRST-EVER LI SUPPLY CHAIN IN EUROPE. THE GOAL IS TO INCREASE THE EUROPEAN LI PROCESSING AND REFINING CAPACITY FOR PRODUCING BATTERY-GRADE CHEMICALS FROM ORES, BRINES, TAILINGS AND OFF-SPECIFICATION BATTERY CATHODE MATERIAL |