Ref.No: | 62312700 |
Start date: | 27.11.2013 |
End date: | 26.07.2014 |
Approval date: | 24.07.2013 |
Department: | CIVIL ENGINEERING |
Sector: | WATER RESOURCES AND ENVIRONMENTAL ENGINEERING |
Financier: | LIMENIKO TAMEIO HANION |
Budget: | 111.700,00 € |
Public key: | ΒΙ0Ε46ΨΖΣ4-2Υ7 |
Scientific Responsible: | KONSTANTINOS MOUTZOURIS |
Email: | lhwmout@central.ntua.gr |
Description: | A REDUCED SCALE MODEL OF THE EXISTING STRUCTURES IN THE PORT OF CHORA SFAKION WILL BE BUILT IN A 3D WAVE BASIN OF THE LABORATORY OF HARBOUR WORKS,NTUA. A STUDY WILL BE CONDUCTED AIMING AT REDUCING WAVE PENETRATION INTO THE HARBOUR BASIN. A REPORT WILL.. |