FEASIBILITY AND VIABILITY STUDY ON THE DEVELOPMENT OF AN INTERMODAL TRANSPORT CORRIDOR (MARITIME-RAIL), RUSSIA -BULGARIA-GREECE (PARTS A AND B)

Ref.No: 62174800
Start date: 25.02.2004
End date: 31.12.2007
Approval date: 11.02.2004
Department: CIVIL ENGINEERING
Sector: TRANSPORTATION PLANNING AND ENGINEERING
Financier: ΔΕΝ ΥΠΑΡΧΕΙ, OSE
Budget: 461.380,00 €
Scientific Responsible: Prof. GKOLIAS
Email: igolias@central.ntua.gr
Description: THE OBJECTIVE OF THIS PROJECT IS TO PERFORM A FULL FEASIBILITY AND VIABILITY STUDY OF THREE ALTERNATIVE PROPOSALS FOR DEVELOPING AN INTERMODAL TRANSPORT CORRIDOR THAT WILL CONNECT THE NOVOROSSISK HARBOUR WITH ONE OF THE FOLLOWING GREEK PORTS...