Ref.No: | 62289100 |
Start date: | 30.07.2011 |
End date: | 29.01.2012 |
Approval date: | 22.07.2011 |
Department: | CHEMICAL ENGINEERING |
Sector: | MATERIALS SCIENCE AND ENGINEERING |
Financier: | K/X AKTOR A.T.E -MOHLOS A.E. |
Budget: | 17.712,00 € |
Scientific Responsible: | Prof. GEORGIOS MPATIS |
Email: | batis@chemeng.ntua.gr |
Description: | THE AIM OF THE PROJECT IS TO EXAMINE AND ESTIMATE REINFORCEMENT CORROSION AT THE MAIN TUNNEL OF UNDERGROUND ELECTRIC RAILWAY OF ATTICA IN ORDER TO PROPOSE PROTECTION METHODS FOR MAINTENANCE THE DURABILITY OF RAILWAY LINE. THE EXAMINATION OF STEEL REINFO |