ANALYSIS AND PARAMETRIC INVESTIGATION OF THE DESIGN AND OPERATION OF NEW PUMPING UNITS IN THE HPPS OF POURNARI AND KASTRAKI.

Ref.No: 62424500
Start date: 15.03.2024
End date: 14.07.2024
Approval date: 28.02.2024
Department: MECHANICAL ENGINEERING
Sector: FLUIDS
Financier: DEI A.E.
Budget: 24.800,00 €
Public key: 9ΡΨ646ΨΖΣ4-12Φ
Scientific Responsible: Prof. ANAGNOSTOPOULOS
Email: j.anagno@fluid.mech.ntua.gr
Description: THE OBJECT OF THE RESEARCH PROJECT IS TO INVESTIGATE THE POSSIBILITY OF INSTALLING PUMPING UNITS IN HYDROELECTRIC PLANTS OF PPC, WHICH HAVE PAIRS OF RESERVOIRS, IN ORDER TO EXPLOIT THE POSSIBILITY OF ENERGY STORAGE BY PUMPING FROM THE LOWER TO THE UPPER RESERVOIR. SOFTWARE WILL BE USED TO MODEL THE OPERATION OF ALL UNITS WITH THE AIM OF OPTIMIZING THE PUMP STATION DESIGN