PRIMARY ENERGY SUBSTITUTION BY INTEGRATION OF A WASTE INCINERATION INTO AN EXISTING COAL FIRED POWER STATION AS A HYBRID PLANT CONFIGURATION

Ref.No: 67036303
Start date: 01.01.2000
End date: 31.12.2009
Approval date: 04.03.2005
Department: MECHANICAL ENGINEERING
Sector: THERMAL ENGINEERING
Financier: ΕΘΝΙΚΗ ΣΥΜΜΕΤΟΧΗ 2004, GGET / ETHNIKI SUMMETOHI
Budget: 4.226,77 €
Scientific Responsible: Prof. KAKARAS
Email: ekak@central.ntua.gr
Go to Top