PRE-FEASIBILITY STUDY OF GAS TURBINE RE-POWERING FOR LIGNITE POWER PLANTS

Ref.No: 62286100
Start date: 20.05.2011
End date: 30.04.2012
Approval date: 20.05.2011
Department: MECHANICAL ENGINEERING
Sector: THERMAL ENGINEERING
Financier: DEPA AE
Budget: 19.680,00 €
Scientific Responsible: Prof. KAKARAS
Email: ekak@central.ntua.gr
Description: NTUA WILL CONDUCT A SURVEY OF THE STATE OF THE ART IN GAS TURBINE RE-POWERING OPTIONS FOR EXISTING LIGNITE-FIRED POWER PLANTS AND ASSESS THE ROLE OF SUCH UNITS ON THE ELECTRICITY MARKET AND THE SYSTEΜ'S ELECTRICITY MARGINAL PRICE. DESIGN AND OPERATING..