IMPACT OF WIND PENETRATION FOR 5 UP TO 20GW UNTIL 2025 ON THE OPERATION OF THE GREEK POWER GENERATION SYSTEM-COST ASSESSMENT FOR NORMAL DISPATCH

Ref.No: 62237400
Start date: 15.07.2008
End date: 30.06.2009
Approval date: 18.04.2008
Department: ELECTRICAL & COMPUTER ENGINEERING
Sector: ELECTRIC POWER
Financier: RAE - RUTHMISTIKI ARHI ENERGEIAS
Budget: 72.600,00 €
Scientific Responsible: Prof. DIALYNAS
Email: dialynas@power.ece.ntua.gr
Description: THE BASIC SUBJECTS OF THE PROJECT ARE: PRESENTATION OF THE RELEVANT STUDIES BEING CONDUCTED ABROAD,DETERMINATION OF APPROPRIATE SENARIA FOR THE ELECTRIC LOAD AND ENERGY DEMAND OF THE GREEK SYSTEM CONCERNING THE PERIOD 2010-2025,DISPATCH OF GENERATION...