Ref.No: | 62311200 |
Start date: | 23.04.2013 |
End date: | 22.10.2013 |
Approval date: | 06.06.2013 |
Department: | CIVIL ENGINEERING |
Sector: | STRUCTURAL ENGINEERING |
Financier: | ABB AB/SWEDEN |
Budget: | 22.755,00 € |
Scientific Responsible: | Prof. SPYRAKOS |
Email: | cspyrakos@gmail.com |
Description: | EXECUTION OF SEISMIC TESTS ON IPP CONVERTER TRANSFORMER HVDC BUSHING TYPE GOF-SR 1950 FOR ABB-SWEDEN. THE TEST REPORT ISSUED BY LEE/NTUA SHALL BE IN ACCORDANCE WITH GUIDELINES GIVEN IN IEEE 693-2005. THE TEST REPORT SHALL BE SIGNED BY RESPONSIBLE ENGINE |